Explore Evers & Sons' portfolio of completed work that showcases our expertise in delivering safe, reliable, and high-quality energy infrastructure services for clients nationwide.
6
Service Divisions
5
Integrated Support Services
1
Partner for Your Next EPC Project
4+
Decades of Experience
Facilities
TEXAS
Mainline Pump Stations
Evers & Sons was contracted to install twin greenfield water transfer pump stations simultaneously.
Terminals & Storage
Facilities
LOUISIANA
Sabine Transmission Booster Station
Evers & Sons Inc. was contracted to install a new greenfield transmission booster compressor station, constructed alongside a new substation as part of a two-phase expansion.
Compression
Facilities
LOUISIANA
Brownfield Facility Expansion – LO-CAT® Trains and Gas Treating System
Evers & Sons Inc. partnered with the client to expand an existing brownfield treating facility with new equipment supporting the operation of three (3) sulfur recovery units (LO-CAT trains) and a shared chemical storage area.
Gas Treating & Processing
Facilities
LOUISIANA
LO-CAT® Trains and Balance of Plant Construction
After successfully completing the original greenfield treating facility, Evers & Sons Inc. partnered again with the client to execute an expansion project supporting the operation of two (2) sulfur recovery units (LO-CAT trains) and a common chemical storage area.
Gas Treating & Processing
Facilities
LOUISIANA
(2) Titan 130 OGM Solar Turbine Compressor Stations
Evers & Sons Inc. was responsible for the civil, structural, and mechanical installation for this greenfield project designed to handle 1.6 BCFD.
Compression
Facilities
TEXAS
Platform Topside Replacement
This project involved the installation and field welding of all 2” through 36” process piping (class 150-900#), open and closed drain piping, and utility piping.
Renewable & Specialty
Facilities
LOUISIANA
Greenfield Natural Gas Treating Facility
The project consisted of a greenfield natural gas treating facility, which included the installation of amine treating, H2S treating, gas dehydration, filtration equipment, gas compression, air compression, flare, inlet and outlet piping interconnects, and all associated piping installation/fabrication work. Structural steel installation was also included (prefabricated by others).
Gas Treating & Processing
Pipeline
TEXAS
Regulating Station
Evers & Sons Inc. completed the installation of four pressure improvement DRS units tied into an existing trunkline in the North Texas region.
Metering & Regulation
Pipeline
TEXAS
Flowline Program Work
Evers & Sons Inc. completed 85 standalone projects involving the turnkey installation of multiple 4”, 6”, and 8” FlexSteel flowlines connecting pad to pad.