MISSISSIPPI / ALABAMA
18 Mile High-Pressure Sour Gas Pipeline
Evers & Sons Inc. successfully completed a pipeline project designed for the transportation of high-pressure sour gas to a treatment plant. This project included the installation of 18 miles of 6” steel pipeline, incorporating 13,750 linear feet of bores and drills, and the fabrication and installation of critical components such as a launcher, receiver, and three MLBVs. The project also included the successful crossing of 73 listed wetlands.
Mainline & Transportation
Facilities
TEXAS
Ten (10) Gas and Oil Central Transfer Facilities
This project was designed to receive, separate, process, and distribute natural gas, crude oil, and produced water directly from well sites.
Production & Gathering
Fabrication
TEXAS
Large Bore Equipment Interconnect Piping
Evers & Sons Inc. was responsible for the procurement, fabrication, NDE, hydrotesting, stenciling, and delivery of all piping and materials required for field installation.
Pipe
Fabrication
TEXAS
Modular Pipe Racks
Evers & Sons Inc. undertook a comprehensive scope for this project, including procurement, fabrication of mechanical and structural components, internal and external coating, NDE, hydrotesting, and delivery.
Pipe
Facilities
TEXAS
CDP Terminal
The CDP Terminal included (4) 45,000-barrel storage tanks for the storage and blending of on-spec crude oil.
Terminals & Storage
Facilities
TEXAS
Salt Water Disposal (SWD) Facility
The project consisted of the construction of a SWD (Salt Water Disposal) facility designed to meet an injection rate of up to 120,000 bbl/d at injection pressures up to 5,000 psi.
Production & Gathering
Facilities
TEXAS
Central Tank Batteries
The project consisted of (10) Central Tank Batteries designed to receive, separate, and distribute natural gas, crude oil, and produced water directly from well sites.
Production & Gathering
Pipeline
TEXAS
84.5 Mile Crude Oil Pipeline to Gulf Coast Tank Storage Facility
Evers & Sons Inc. completed an 84.5-mile, 12” crude oil pipeline project designed to transport product to a tank storage facility on the Gulf Coast.
Mainline & Transportation
Fabrication
TEXAS
Blow Case Skid
Evers & Sons Inc. managed the procurement, fabrication, NDE, hydrotesting, stenciling, and delivery of all piping and materials required for field installation.