Pipeline

MISSISSIPPI / ALABAMA

18 Mile High-Pressure Sour Gas Pipeline

Evers & Sons Inc. successfully completed a pipeline project designed for the transportation of high-pressure sour gas to a treatment plant. This project included the installation of 18 miles of 6” steel pipeline, incorporating 13,750 linear feet of bores and drills, and the fabrication and installation of critical components such as a launcher, receiver, and three MLBVs. The project also included the successful crossing of 73 listed wetlands.

Mainline & Transportation

Facilities

TEXAS

Ten (10) Gas and Oil Central Transfer Facilities

This project was designed to receive, separate, process, and distribute natural gas, crude oil, and produced water directly from well sites.

Production & Gathering

Fabrication

TEXAS

Large Bore Equipment Interconnect Piping

Evers & Sons Inc. was responsible for the procurement, fabrication, NDE, hydrotesting, stenciling, and delivery of all piping and materials required for field installation.

Pipe

Fabrication

TEXAS

Modular Pipe Racks

Evers & Sons Inc. undertook a comprehensive scope for this project, including procurement, fabrication of mechanical and structural components, internal and external coating, NDE, hydrotesting, and delivery.

Pipe

Facilities

TEXAS

CDP Terminal

The CDP Terminal included (4) 45,000-barrel storage tanks for the storage and blending of on-spec crude oil.

Terminals & Storage

Facilities

TEXAS

Salt Water Disposal (SWD) Facility

The project consisted of the construction of a SWD (Salt Water Disposal) facility designed to meet an injection rate of up to 120,000 bbl/d at injection pressures up to 5,000 psi.

Production & Gathering

Facilities

TEXAS

Central Tank Batteries

The project consisted of (10) Central Tank Batteries designed to receive, separate, and distribute natural gas, crude oil, and produced water directly from well sites.

Production & Gathering

Pipeline

TEXAS

84.5 Mile Crude Oil Pipeline to Gulf Coast Tank Storage Facility

Evers & Sons Inc. completed an 84.5-mile, 12” crude oil pipeline project designed to transport product to a tank storage facility on the Gulf Coast.

Mainline & Transportation

Fabrication

TEXAS

Blow Case Skid

Evers & Sons Inc. managed the procurement, fabrication, NDE, hydrotesting, stenciling, and delivery of all piping and materials required for field installation.