Blow Case Skid

Project Overview

Evers & Sons Inc. managed the procurement, fabrication, NDE, hydrotesting, stenciling, and delivery of all piping and materials required for field installation.

The Blow Case Skid project included the design and fabrication of two dual-stamped horizontal code vessels, each built to meet rigorous industry standards and certified for high-pressure operation.

Scope of Work:

Procurement, Fabrication, NDE (Non-Destructive Examination), Hydrotesting, Stenciling, Delivery

Components Fabricated:

  • Dual-stamped Horizontal Code Vessels
  • U Stamp Section VIII, Division 1 Code Vessel
  • Registered through the National Board
  • Insured through ABS Consulting
  • Dual-stamped for 1440 psig @ -20°F/130°F and 1,350 psig @ -20°F/200°F
  • Material: SA-516-70
  • Flow Rate: 3,500
  • Corrosion Allowance: 0.06″
  • Operating Temp: 100°F
  • Operating Pressure: 1200 psig

Additional Scope:

Fabrication of multiple process skids, including:

  • Inlet Discharge Skids
  • Coalescing Filter Skids
  • Strainer Skids

Download Project Sheet

Evers & Sons Blow Case Skid
Contact Information

[email protected]
www.eversandsons.com
(979) 596-2139
(800) 552-1236

Let's partner on your next project.