Blow Case Skid

Skids

Project Overview

Evers & Sons Inc. managed the procurement, fabrication, NDE, hydrotesting, stenciling, and delivery of all piping and materials required for field installation. This project included the design and fabrication of two dual-stamped horizontal code vessels, each built to meet rigorous industry standards and certified for high-pressure operation.

Scope of Work:

  • Procurement
  • Fabrication
  • NDE (Non-Destructive Examination)
  • Hydrotesting
  • Stenciling
  • Delivery

Components Fabricated:

  • Dual-stamped horizontal code vessels
  • U Stamp section VIII, Division 1 code vessel
  • Registered through the National Board
  • Insured through ABS Consulting
  • Dual-stamped for 1440 psig @ -20°F/130°F and 1,350 psig @ -20°F/200°F
  • Material: SA-516-70
  • Flow Rate: 3,500
  • Corrosion Allowance: 0.06″
  • Operating Temperature: 100°F
  • Operating Pressure: 1200 psig

Additional Scope:

Fabrication of multiple process skids, including:

  • Inlet discharge skids
  • Coalescing filter skids
  • Strainer skids