Evers & Sons Inc. completed an 84.5-mile, 12” crude oil pipeline project designed to transport product to a tank storage facility on the Gulf Coast. This project included the installation of a launcher, receiver, nine MLBVs, and two pump stations.
Additionally, the project involved 42,705 linear feet of drills and bores, including a 3.5-mile section through the Coastal Bend Bays and Estuaries land. The scope was expanded to include the installation of a dual 12” bundled drill spanning 810 linear feet, with an isolation and bypass installation into the existing pipeline.
Length & Configuration:
84.5 miles of 12” Crude Oil Pipeline
Components Installed:
- 1 Launcher
- 1 Receiver
- 9 MLBVs
- 2 Pump Stations
- 42,705 Linear Feet of Drills and Bores
- 3.5 miles through Coastal Bend Bays and Estuaries Land
Additional Scope:
- Installation of a dual 12”, 810 linear foot bundled drill with an isolation and bypass installation into the existing pipeline
Functionality:
This pipeline transports crude oil to a tank storage facility on the Gulf Coast, ensuring efficient and reliable product delivery.