Mainline Pump Stations

Terminals & Storage

Project Overview

Evers & Sons Inc. was contracted to install twin greenfield water transfer pump stations simultaneously. Each site consisted of (5) 500HP Cornell pumps capable of moving up to 125,000 bpd each on a common 30” header. Each MLP site also required large-bore carbon steel, stainless steel and polyethylene piping work to complete tie-ins to existing mainlines and pond fill lines up to 18’ below grade.

Station Key Equipment Per Site:

  • (5) 500 HP Cornell pumps
  • Sump pump
  • Ultrasonic meter
  • Vacuum pump package
  • MCC/SWGR building with (2) 4-ton HVAC units
  • Air compressors

Scope of Work:

  • Concrete & structural installation for both mechanical and electrical foundations
  • Prefabrication and internal coating of all interconnect piping
  • Prefabrication and installation of all structural packages
  • Field installation of all interconnect piping and pressure testing
  • Equipment installation inclusive of grouting all rotating equipment
  • Coating, insulation/jacketing

The mainline pump station projects were designed to support the significant ramp-up of drilling and completions requirements, while reducing the reliance on external freshwater sources and allowing for “recycling” to mitigate the need for disposal of produced water from these operations.