Explore Evers & Sons' portfolio of completed work that showcases our expertise in delivering safe, reliable, and high-quality energy infrastructure services for clients nationwide.
6
Service Divisions
5
Integrated Support Services
1
Partner for Your Next EPC Project
4+
Decades of Experience
Facilities
TEXAS
CDP Terminal
The CDP Terminal included four (4) 45,000-barrel storage tanks for the storage and blending of on-spec crude oil.
Terminals & Storage
Facilities
TEXAS
Salt Water Disposal (SWD) Facility
The project consisted of the construction of a SWD (Salt Water Disposal) facility designed to meet a maximum injection rate of up to 120,000 bbls/d at injection pressures up to 5,000 psi.
Production & Gathering
Facilities
TEXAS
Central Tank Batteries
The project consisted of (10) Central Tank Batteries designed to receive, separate, and distribute natural gas, crude oil, and produced water directly from well sites.
Production & Gathering
Facilities
TEXAS
Natural Gas Liquids (NGL) Loading Station
This project was an NGL Loading Station designed to serve as the central sales terminal for natural gas liquids (NGLs) across a region encompassing over 440,000 acres of wells and 400 miles of gathering system.
Terminals & Storage
Facilities
LOUISIANA
Cryogenic Plant
Evers & Sons’ scope included the procurement and installation of all civil (dirt and cement), structural (racks, supports, clamps, walkways, and access platforms), equipment setting, and interconnecting piping.
Gas Treating & Processing
Facilities
TEXAS
One (1) Greenfield Compressor Station
This project involved the construction of a new greenfield compressor station with a total compression capacity of 200 MMSCFD, boosting pressure from 65 PSIG to 1,250 PSIG through (10) natural gas-driven CAT 3612 compressors.
Compression
Facilities
TEXAS
Four (4) Mechanical Refrigeration Units
Each system consisted of 100 MMSCFD capacity and included the following major components:
