Project Overview
Each system consisted of 100 MMSCFD capacity and included the following major components:
- (1) Compressor Skid
- (1) Refrigeration Condenser
- (1) Process Chiller Skid
- (1) Overhead Gas Compressor Package
- (1) EG Regeneration Package
- (1) BTEX Unit
- (1) Hot Oil System
Major Equipment Specifications
Compressor Skid
- Compressor: Rotary Screw, Frick NGCH400A
- Engine: Natural Gas, 1035 hp @ 1400 rpm, Caterpillar G3512B
- Accessories: Lube Oil Separator, Pre-Lube Pump, (2) Lube Oil Filters, Fin-Fan Cooler
- Configuration: Skid Mounted
Refrigeration Condenser & Frame
- Type: Fin-Fan
- Capacity: 9,529,953 BTU/hr
- Airflow: 171,108 ACFM
- Design: 3-Pass x 6-Rows
- Motors: Electric, 50 hp @ 1750 rpm, Frame 326T, Baldor
Process Chiller Skid
- Chiller: Shell – 350 psig @ 200°F, Tube – 675 psig @ 200°F
- Stabilizer Reboiler: Shell – 500 psig @ 500°F, Tube – 150 psig @ 500°F
- Stabilizer Tower: 36 in ID x 686 in S/S
- Oil Reclaimer: 350 psig @ 200°F, 12-3/4 in OD x 60 in S/S
- Low Temperature Separator: 675 psig @ 200°F, 60 in ID x 480 in S/S
EG Regeneration Package
- Capacity: 800,000 BTU/hr
- Components: EG Reboiler, Packed Stripper Column, Lean/Rich Exchanger, Flash Drum
- Filtration: (2) Pre-Filters, Carbon Filter, (2) Post-Filters
- Pumps: (2) EG Pumps
Overhead Gas Compressor Package
- Capacity: 4.2 MMSCFD
- Operating Conditions:
- Suction: 382 psig @ 76°F
- Discharge: 550 psig @ 150°F
- Components: Compressor (JGP-2, Single-Stage), Electric Motor (150 hp @ 1800 rpm), Suction Scrubber, Suction & Discharge Pulsation Bottle
The original project scope included the development of (4) 50 MMSCFD MRU Gas Processing Systems, each with the following balance of plant materials:
- Instrument Air System with Heatless Dryer
- Flare System
- MCC (Motor Control Center)
- Storage Tanks:
- (3) 400 BBL Condensate Tanks
- (3) 60,000 Gal NGL Bullets
- (1) BTEX Unit
- (1) VRU Skid
- (1) EG Skid
- (1) Fuel Gas Heater
- (1) Hot Oil Heater
- (2) Overhead Residue Compressors
- (1) Receiver/Economizer
- (5) CAT 3606 Compressors
- (1) 50 MMSCFD MRU
- Sulfa Treat System
- (2) Control Room Workstations with defined operating systems
- Interconnecting Piping
- Civil, Mechanical, and Electrical Construction
Midway through construction, the scope expanded due to the requirement to double gas processing capacity at each of the four sites to 100 MMSCFD.
Additional Work (Outside Original Contract):
- (1) 450 GPM Amine Plant
- Included Product Coolers, Reboiler, Regeneration System, and Absorber
- (7) Facility Pads
- Size: 900 ft x 900 ft each
- Earthwork: Over 1,000,000 CYDs of combined cut and fill
Evers & Sons’ scope included the procurement and installation of all civil (dirt and cement), structural (racks, supports, clamps, walkways, and access platforms), piping, electrical and instrumentation, as well as heat trace and insulation at all four locations.
Download Project Sheet