Greenfield Natural Gas H₂S Treating Facility

LOUISIANA

Project Overview

Evers & Sons provided full field installation services for a greenfield natural gas H₂S treating facility with a design capacity of 400 MMcfd. The facility was part of a larger gathering system delivering gas volumes to the Gulf Coast and was designed to treat natural gas to meet pipeline H₂S specifications. The project expanded treating capacity to support safe, compliant, and reliable downstream transportation.

Key Equipment:

  • (1) 72” OD x 40’ seam to seam Slug Catcher
  • 12” Flow Control
  • (2) 60” OD x 10’ seam to seam Inlet Separators
  • (8) H2S Scavenger Treating Skids
  • (1) 30” ID x 10’ seam to seam Flash Gas Separator
  • (1) 20’ Tank Vent Flare Stack
  • (1) MCC Building
  • (1) Diesel Powered Caterpillar Backup Generator
  • 400 BBL Produced Water/Oil Tank
  • Secondary Containment

Scope of Work:

  • Concrete
  • Structural Steel
  • Mechanical Piping
  • Mechanical Equipment Installation
  • Electrical
  • Instrumentation
  • Facility Painting
  • Piping and Equipment Insulation

Field Installation – Stats:

  • ±110 cubic yards concrete
  • ±20 tons structural steel
  • 475 – prefabricated pipe spools
  • ±5,000 linear ft. pipe – from 1” to 16”
  • 350 field welds
  • ±4,500 field weld inches
  • 475 flange torques
  • 2180 – linear feet pipe insulation
  • 250 – removable insulation blankets