Project Overview

Evers & Sons provided fabrication of fire tube assemblies designed for use in midstream heating applications. The project was executed as a fabrication-only delivery, with all components fabricated, tested, and coated in-house prior to delivery. The project scope included procurement of plate and pipe materials, fire tube fabrication, welding, NDE services, hydrotesting, painting, and full QA/QC inspections to meet project specifications.

Scope of Work:

  • Procurement of plate and pipe materials
  • Fire tube fabrication and welding
  • NDE services
  • Hydrotesting
  • Surface preparation and painting
  • QA/QC inspection and documentation
  • Load-out and delivery

Fabrication Details:

  • Firebox Configuration: 36’-0” long central flue firebox
  • Cover Plate: 7’-0” radius cover plate
  • Heat Capacity: 4.83 MMBTU
  • Materials:
    • 1½” carbon steel plate
    • 30” pipe
    • 10” pipe
  • Welding Methods: GMAW / FCAW

Components Fabricated:

  • Fire tube assemblies
  • Central flue fireboxes
  • Cover plates
  • Welded pressure components