Project Overview
Evers & Sons provided fabrication of fire tube assemblies designed for use in midstream heating applications. The project was executed as a fabrication-only delivery, with all components fabricated, tested, and coated in-house prior to delivery. The project scope included procurement of plate and pipe materials, fire tube fabrication, welding, NDE services, hydrotesting, painting, and full QA/QC inspections to meet project specifications.
Scope of Work:
- Procurement of plate and pipe materials
- Fire tube fabrication and welding
- NDE services
- Hydrotesting
- Surface preparation and painting
- QA/QC inspection and documentation
- Load-out and delivery
Fabrication Details:
- Firebox Configuration: 36’-0” long central flue firebox
- Cover Plate: 7’-0” radius cover plate
- Heat Capacity: 4.83 MMBTU
- Materials:
- 1½” carbon steel plate
- 30” pipe
- 10” pipe
- Welding Methods: GMAW / FCAW
Components Fabricated:
- Fire tube assemblies
- Central flue fireboxes
- Cover plates
- Welded pressure components
Download Project Sheet