Project Overview
Evers & Sons installed 1,200 linear feet of 6-inch steel pipeline to support a new well connection to existing infrastructure. The scope included fabrication and installation of a 6-inch meter run with associated piping, along with hydrotesting to verify system integrity prior to integration.
Length & Configuration:
Installation of 1,200 linear feet of 6″ steel pipeline
Functionality:
The installation enabled a new well connection to existing infrastructure, allowing production to be safely introduced into the system.
Download Project Sheet
Let's partner on your next project.

