Project Overview
Evers & Sons removed an existing 6-inch launcher, underground jumper line, check valve, and associated bypass piping and installed new fabricated piping to reconfigure the system. The new installation was tested and integrated to support a new well connection into existing infrastructure.
Functionality:
The work enabled a new well connection to existing infrastructure by reconfiguring the system to safely introduce production into the pipeline network.