Project Overview

This project included the installation of 5.8 miles of 8-inch steel pipeline to support reliable product transport. The scope also included 3,434 linear feet of horizontal directional drills and conventional bores to navigate terrain and infrastructure with minimal surface disruption. A custom launcher and receiver were fabricated in-house and installed on site to support future pipeline maintenance operations.

Length & Configuration:

  • 5.8 miles of 8” steel pipeline

Components Installed:

  • 1 Launcher
  • 1 Receiver
  • 3,434 linear feet of Drill and Bores

Additional Scope:

  • Installation of a Meter and Regulator Station
  • Commissioned the pipeline to receive gas

Functionality:

Designed and installed to transport natural gas efficiently from the distribution point to the end user to operate their semiconductor plant.

Download Project Sheet

Image
Contact Information

[email protected]
www.eversandsons.com
(979) 596-2139
(800) 552-1236

Let's partner on your next project.