Project Overview
Evers & Sons installed 8,346 linear feet of 16-inch steel pipeline to connect a central processing facility to existing pipeline infrastructure. The project included installation of prefabricated 16-inch launcher and receiver assemblies and fabrication and installation of an 8-inch dual meter run with associated piping to support system integration.
Length & Configuration:
Installation of 8,346 linear feet of 16″ steel pipeline
Components Installed:
- Installation of one each 16’’ prefabricated launcher and receiver
- Installation of 8’’ dual meter run and associated piping
Functionality:
The installation connected a central processing facility to existing pipeline infrastructure, enabling reliable system integration.