Project Overview
Evers & Sons completed the installation of 6,670 linear feet of 12-inch steel pipeline to connect new well production to existing infrastructure. The scope included directional drilling, prefabricated launcher and receiver installation, meter fabrication and piping, and construction of surface sites to support safe and reliable natural gas flow into the system.
Length & Configuration:
Installation of 6,670 linear feet of 12″ steel pipeline
Components Installed:
- 1500 linear feet of directional drills including a railroad crossing
- Installation of one each prefabricated 12’’ launcher and receiver
- Fabrication and installation of one 8’’ meter and associated piping
- Construction of (2) 100 X 100 surface sites
Functionality:
The installation enabled a new well connection to existing infrastructure, allowing natural gas to be introduced into the system.