Project Overview
Evers & Sons installed 21,467 linear feet of 12-inch steel pipeline to expand capacity between two existing stations. The scope included installation of prefabricated 12-inch launcher and receiver assemblies and fabrication and installation of station tie-in piping to integrate the new discharge line into the existing system.
Length & Configuration:
Installation of 21,467 linear feet of 12″ steel pipeline
Components Installed:
- Installation of one each 12’’ prefabricated launcher and receiver
- Fabrication and installation of station tie-in piping
Functionality:
The installation expanded discharge capacity between two existing stations to support increased system throughput.