12″ Pipeline Capacity Expansion

Expansions & Modifications

Project Overview

Evers & Sons installed 21,467 linear feet of 12-inch steel pipeline to expand capacity between two existing stations. The scope included installation of prefabricated 12-inch launcher and receiver assemblies and fabrication and installation of station tie-in piping to integrate the new discharge line into the existing system.

Length & Configuration:

Installation of 21,467 linear feet of 12″ steel pipeline

Components Installed:

  • Installation of one each 12’’ prefabricated launcher and receiver
  • Fabrication and installation of station tie-in piping

Functionality:

The installation expanded discharge capacity between two existing stations to support increased system throughput.

Download Project Sheet

Image
Contact Information

[email protected]
www.eversandsons.com
(979) 596-2139
(800) 552-1236

Let's partner on your next project.