Project Overview
Evers & Sons Inc. successfully completed a pipeline project designed for the transportation of high-pressure sour gas to a treatment plant.
This project included the installation of 18 miles of 6” steel pipeline, incorporating 13,750 linear feet of bores and drills, and the fabrication and installation of critical components such as a launcher, receiver, and three MLBVs. The project also included the successful crossing of 73 listed wetlands.
Length & Configuration:
- 18 miles of 6” Steel Pipeline
Components Installed:
- 13,750 Linear Feet of Bores and Drills
Fabrication and Installation of:
- 1 Launcher
- 1 Receiver
- 3 MLBVs
- 73 Listed Wetland Crossings
Functionality:
This pipeline facilitates the transportation of high-pressure sour gas to a treatment plant, ensuring safe and efficient gas processing.